A platform for research: civil engineering, architecture and urbanism
Trends in bridge construction on Ontario highways system
Development of vibratory placing of concrete; use of creosoted timber, application of welding to steel frames and concrete reinforcing; changes in wing wall design; use of creosoted timber for bridges.
Trends in bridge construction on Ontario highways system
Development of vibratory placing of concrete; use of creosoted timber, application of welding to steel frames and concrete reinforcing; changes in wing wall design; use of creosoted timber for bridges.
Trends in bridge construction on Ontario highways system
Eng Contract Rec
Sedgwick, A. (author)
1937
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Trends in bridge construction on Ontario highways
Engineering Index Backfile | 1957
|Construction of highways in Ontario
Engineering Index Backfile | 1929
|Construction of highways in Ontario
Engineering Index Backfile | 1929
|Design and construction of divided highways in Ontario
Engineering Index Backfile | 1950
|Ontario provincial highways development
Engineering Index Backfile | 1926
|