A platform for research: civil engineering, architecture and urbanism
Thin concrete bridge floor wears but little in 10 years
Observations on performance of reinforced concrete floor, 4 3/4 in. thick, of Burnside Bridge across Willamette River in Portland, Ore.
Thin concrete bridge floor wears but little in 10 years
Observations on performance of reinforced concrete floor, 4 3/4 in. thick, of Burnside Bridge across Willamette River in Portland, Ore.
Thin concrete bridge floor wears but little in 10 years
Eng News-Rec
Buck, G.W. (author)
1937
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2003
|blue print - The bench wears socks
Online Contents | 2008
|British Library Online Contents | 2014
|British Library Online Contents | 2014
|factory: The devil wears Tecnica: V. C.
Online Contents | 2010