A platform for research: civil engineering, architecture and urbanism
Office building of composite construction
British Government office buildings under construction at Hastings comprise project deliberately conceived as exercise in site assembly of prefabricated elements, in speed of construction, and in reducing maintenance of completed building; steel frame acts compositely with concrete floors, latter comprising pretensioned precast planks and cast-in-situ topping; frame consists of mild steel sections arranged on 18-ft sq grid, with intermediate floor beams at 9-ft centers.
Office building of composite construction
British Government office buildings under construction at Hastings comprise project deliberately conceived as exercise in site assembly of prefabricated elements, in speed of construction, and in reducing maintenance of completed building; steel frame acts compositely with concrete floors, latter comprising pretensioned precast planks and cast-in-situ topping; frame consists of mild steel sections arranged on 18-ft sq grid, with intermediate floor beams at 9-ft centers.
Office building of composite construction
Engineer
Engineer ; 219
1965
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
CONSTRUCTION METHOD OF OFFICE-FACTORY COMPOSITE BUILDING AND STRUCTURE THEREBY
European Patent Office | 2021
|Tannai Construction Company Office Building
British Library Online Contents | 1996
The Duesseldoffer Stadttor - A 20-Story Office Building in Composite Construction
British Library Conference Proceedings | 1997
|Foundation construction for giant office building
Engineering Index Backfile | 1930