A platform for research: civil engineering, architecture and urbanism
The construction of reservoir embankments
Remarks of Mr. Desmond FitzGerald and Mr. A. Fteley before the Boston Society of Civil Engr's as to the proper methods of laying pipes through reservoir embankments and formation of the embankment itself. Settlement of puddle walls.
The construction of reservoir embankments
Remarks of Mr. Desmond FitzGerald and Mr. A. Fteley before the Boston Society of Civil Engr's as to the proper methods of laying pipes through reservoir embankments and formation of the embankment itself. Settlement of puddle walls.
The construction of reservoir embankments
Eng News
1893
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of reservoir embankments
Engineering Index Backfile | 1894
|Construction of reservoir embankments
Engineering Index Backfile | 1894
Engineering Index Backfile | 1886
Strengthening of Reservoir Embankments
TIBKAT | 2021
|Strengthening of Reservoir Embankments
Springer Verlag | 2021
|