A platform for research: civil engineering, architecture and urbanism
Suspension restoration of the cable and of the Covington and Cincinnati suspension bridge
Cable ends buried in cement mortar and masonry, on removal found to be slightly deteriorated. Prevented from further rusting by encasing in a permanent oil bath. Cable restored to original strength by auxiliary side bars. Full details and description. Trans. A. S. C. E., Feb., 1893, Vol. XXVIII, pp. 47-56. Discussion by members, Trans. A. S. C. E., May, 1893, Vol. XXVIII, pp. 358-371.
Suspension restoration of the cable and of the Covington and Cincinnati suspension bridge
Cable ends buried in cement mortar and masonry, on removal found to be slightly deteriorated. Prevented from further rusting by encasing in a permanent oil bath. Cable restored to original strength by auxiliary side bars. Full details and description. Trans. A. S. C. E., Feb., 1893, Vol. XXVIII, pp. 47-56. Discussion by members, Trans. A. S. C. E., May, 1893, Vol. XXVIII, pp. 358-371.
Suspension restoration of the cable and of the Covington and Cincinnati suspension bridge
Eng Rec
1893
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Covington High Performance Concrete Bridge
British Library Conference Proceedings | 1997
|The river spans of the Cincinnati and Covington Elevated Railway, Transfer and Bridge Company
Engineering Index Backfile | 1890
|