A platform for research: civil engineering, architecture and urbanism
Spurt of speed puts concreting out ahead at clark hill dam
Concrete for 200 ft high dam on Savannah River was placed at maximum rate of 98,556 cu yd per month; cooling of concrete was achieved partly by pouring iced mix in 2.5 ft lift, partly by embedding cooling pipes to circulate river water.
Spurt of speed puts concreting out ahead at clark hill dam
Concrete for 200 ft high dam on Savannah River was placed at maximum rate of 98,556 cu yd per month; cooling of concrete was achieved partly by pouring iced mix in 2.5 ft lift, partly by embedding cooling pipes to circulate river water.
Spurt of speed puts concreting out ahead at clark hill dam
Eng News-Rec
Engineering News-Record ; 145
1950
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Special forms speed concreting
Engineering Index Backfile | 1956
Speed concreting on S.F. Apartments
Engineering Index Backfile | 1949
Hinged forms and hydraulic traveler are concreting squirrel hill tunnel
Engineering Index Backfile | 1950