A platform for research: civil engineering, architecture and urbanism
Concrete arch dam, 100 m high, 200 m long, forms reservoir of 150 million cu m; data on stress analysis, expansion joints, intake and gallery; four Francis turbines develop 18,000 hp each; alternators of 17,000 kva, 10,000 v; single phase transformers of 10,000 kva, 10/130 kv; measurement of deformations.
Concrete arch dam, 100 m high, 200 m long, forms reservoir of 150 million cu m; data on stress analysis, expansion joints, intake and gallery; four Francis turbines develop 18,000 hp each; alternators of 17,000 kva, 10,000 v; single phase transformers of 10,000 kva, 10/130 kv; measurement of deformations.
Le barrage de Castillon
Le barrage de Castillon
Ehrmann, P. (author)
1949
41 pages
4 Supp Plates, Photographs, Schematic Drawings
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
La reconstruction du pont de Castillon-Sur-Dordogne
Engineering Index Backfile | 1951
|