A platform for research: civil engineering, architecture and urbanism
Winter concreting practice on large dams
Methods followed in winter concreting dealing with supply of steam heat, housing of equipment, heating aggregates, distributing concrete, forms, curing, fire protection and costs; winter concreting costs some 8% more than that poured at normal temperatures.
Winter concreting practice on large dams
Methods followed in winter concreting dealing with supply of steam heat, housing of equipment, heating aggregates, distributing concrete, forms, curing, fire protection and costs; winter concreting costs some 8% more than that poured at normal temperatures.
Winter concreting practice on large dams
Eng J
Mitchell, G. (author) / Yong, R.B. (author)
Engineering Journal ; 33
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Recommended practice for winter concreting
Engineering Index Backfile | 1956
Online Contents | 1986
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1967