A platform for research: civil engineering, architecture and urbanism
Infra-red lamps replace gas heaters for protecting steel-formed concrete
Fresh concrete of earth fill dam cutoff wall is kept from freezing by banks of 250-w infrared lamps; so far no attempt has been made to place method on scientific basis.
Infra-red lamps replace gas heaters for protecting steel-formed concrete
Fresh concrete of earth fill dam cutoff wall is kept from freezing by banks of 250-w infrared lamps; so far no attempt has been made to place method on scientific basis.
Infra-red lamps replace gas heaters for protecting steel-formed concrete
Eng News-Rec
Engineering News-Record ; 144
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shrubs replace steel and concrete
Engineering Index Backfile | 1949
|Foundation piling-steel to replace concrete
British Library Online Contents | 2002
|Steel rail piles replace concrete piles
Engineering Index Backfile | 1947
|Foundation piling-steel to replace concrete
British Library Online Contents | 2001
|