A platform for research: civil engineering, architecture and urbanism
Crossing delaware -- From Delaware
Delaware Memorial 4-lane suspension bridge has 2150-ft main span, 750 ft side spans, 41 approach piers and two abutments; west anchorage pier and tower piers built by open dredged caisson methods and east anchorage pier in cofferdam 95 × 221 ft; caisson contains 60 dredge wells 15 ft in diam; foundations and anchorages.
Crossing delaware -- From Delaware
Delaware Memorial 4-lane suspension bridge has 2150-ft main span, 750 ft side spans, 41 approach piers and two abutments; west anchorage pier and tower piers built by open dredged caisson methods and east anchorage pier in cofferdam 95 × 221 ft; caisson contains 60 dredge wells 15 ft in diam; foundations and anchorages.
Crossing delaware -- From Delaware
Eng News-Rec
Engineering News-Record ; 144
1950
3 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1995
|Elsevier | 1987
UB Braunschweig | 1966
|Elsevier | 1984