A platform for research: civil engineering, architecture and urbanism
Six contractors tackle first bridge over Chesapeake
Steel truss bridge, 21,286 ft long contains 1600 ft suspension span 450 to 780 ft cantilevers, and 255 to 305 ft deck truss spans; 600 H piles are required at each anchorage; bridge is strung out for 4 mi between Sandy Point and Kent Island, Maryland; typical construction stages illustrated.
Six contractors tackle first bridge over Chesapeake
Steel truss bridge, 21,286 ft long contains 1600 ft suspension span 450 to 780 ft cantilevers, and 255 to 305 ft deck truss spans; 600 H piles are required at each anchorage; bridge is strung out for 4 mi between Sandy Point and Kent Island, Maryland; typical construction stages illustrated.
Six contractors tackle first bridge over Chesapeake
Eng News-Rec
Engineering News-Record ; 145
1950
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
ASCE | 2021
|Engineering Index Backfile | 1953
CHESAPEAKE & DELAWARE CANAL BRIDGE
Online Contents | 1995