Increasing clearance of overbridge
14 of 19 road overbridges on Nuremberg-Regensburg section of German Railways, too low for electrified line, had to be lifted; in short line possessions, bridge superstructures were lifted and placed on broad flanged I-beams inserted between girders and built up ends of abutments; with arched overbridges, required clearance was not available at haunches of arch; required headroom gained by replacing central part of arch by rigid horizontal frame of reinforced concrete, absorbing lateral thrust of arch.
Increasing clearance of overbridge
14 of 19 road overbridges on Nuremberg-Regensburg section of German Railways, too low for electrified line, had to be lifted; in short line possessions, bridge superstructures were lifted and placed on broad flanged I-beams inserted between girders and built up ends of abutments; with arched overbridges, required clearance was not available at haunches of arch; required headroom gained by replacing central part of arch by rigid horizontal frame of reinforced concrete, absorbing lateral thrust of arch.
Increasing clearance of overbridge
Ry Gaz
Railway Gazette ; 92
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Thorndon overbridge seismic retrofit
British Library Conference Proceedings | 1996
|"Thorndon Overbridge Seismic Assessment"
British Library Conference Proceedings | 1994
|