A platform for research: civil engineering, architecture and urbanism
Prestressed-concrete bridge over river Tame
Bridge built on Freyssinet principle at Denton sewage treatment works, to link sewage plant east of river with sludge disposal extensions being installed on west bank; it provides 10-ft roadway for 10-ton trucks, and is laid with 24-in. gage railway track; clear span over river 78 ft; bridge consists of two concrete beams cast monolithically with 6-in. thick road slab and series of transverse ribs. (See also Engineering v 169 n 4398 May 12 1950 p 545; Engineer v 189 n 4920 May 12 1950 p 582; Surveyor v 109 n 3040 May 12 1950 p 273)
Prestressed-concrete bridge over river Tame
Bridge built on Freyssinet principle at Denton sewage treatment works, to link sewage plant east of river with sludge disposal extensions being installed on west bank; it provides 10-ft roadway for 10-ton trucks, and is laid with 24-in. gage railway track; clear span over river 78 ft; bridge consists of two concrete beams cast monolithically with 6-in. thick road slab and series of transverse ribs. (See also Engineering v 169 n 4398 May 12 1950 p 545; Engineer v 189 n 4920 May 12 1950 p 582; Surveyor v 109 n 3040 May 12 1950 p 273)
Prestressed-concrete bridge over river Tame
Concrete Constr Eng
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed concrete bridge over Medway River (England)
Engineering Index Backfile | 1964
|Prestressed concrete bridge over river Medway in England
Engineering Index Backfile | 1962