A platform for research: civil engineering, architecture and urbanism
Bridge replacement in Lowell, Mass, with precast reinforced concrete units; available mobile hoisting equipment limited max weight of sections to 12 tons; precasting and construction processes described and illustrated. (See also Am Concrete Inst -- J v 21 n 5 Jan 1950 p 317-28)
Bridge replacement in Lowell, Mass, with precast reinforced concrete units; available mobile hoisting equipment limited max weight of sections to 12 tons; precasting and construction processes described and illustrated. (See also Am Concrete Inst -- J v 21 n 5 Jan 1950 p 317-28)
Precast units for short-span bridges
Eng News-Rec
Kearney, S. (author)
Engineering News-Record ; 144
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast units for short-span bridges
Engineering Index Backfile | 1950
|Precast Arches as Innovative Alternative to Short-Span Bridges
British Library Conference Proceedings | 1995
|Precast Arches as Innovative Alternative to Short-Span Bridges
British Library Conference Proceedings | 1995
|Cracking and Reinforcement Corrosion in Short-Span Precast Concrete Bridges
Online Contents | 2007
|