A platform for research: civil engineering, architecture and urbanism
Application of prestressed concrete to reconstruction of "Pont des Trous" over Scheldt River at Tournai, Belgium
Two towers of masonry of circular cross section 12 m in diam, weighing 2700 tons each, had to be raised by 2.4 m; this was achieved by prestressed concrete grating between which lifting jacks were installed.
Application of prestressed concrete to reconstruction of "Pont des Trous" over Scheldt River at Tournai, Belgium
Two towers of masonry of circular cross section 12 m in diam, weighing 2700 tons each, had to be raised by 2.4 m; this was achieved by prestressed concrete grating between which lifting jacks were installed.
Application of prestressed concrete to reconstruction of "Pont des Trous" over Scheldt River at Tournai, Belgium
Application du beton precontaint au relevement du "Pont des Trous", sur l'Escaut, a Tournai
1949
10 pages
Photographs
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Le relevement du Pont des Trous, a Tournai
Engineering Index Backfile | 1948
|Microscopical study of ancient mortars from Tournai (Belgium)
Tema Archive | 2004
|Construction of vehicular tunnels under Scheldt River at Antwerp, Belgium
Engineering Index Backfile | 1933
|