A platform for research: civil engineering, architecture and urbanism
Construction of Delaware Bridge anchorage cofferdam
Illustrated data on foundation of east anchor pier; sheetpiling for cofferdam was driven around 99×225×49-ft bracing system prefabricated in four approximately equal sections; 27,000 cu yd of tremie seal concrete placed in one continuous operation; description of floating concrete plants and anchorage block construction. (see also similar description by C.H.COTTER in Civ Eng (NY) v 20 n 11 Nov 1950 p 29-32)
Construction of Delaware Bridge anchorage cofferdam
Illustrated data on foundation of east anchor pier; sheetpiling for cofferdam was driven around 99×225×49-ft bracing system prefabricated in four approximately equal sections; 27,000 cu yd of tremie seal concrete placed in one continuous operation; description of floating concrete plants and anchorage block construction. (see also similar description by C.H.COTTER in Civ Eng (NY) v 20 n 11 Nov 1950 p 29-32)
Construction of Delaware Bridge anchorage cofferdam
Eng News-Rec
Davies, A.L. (author)
Engineering News-Record ; 144
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Delaware Bridge anchorage cofferdam
Engineering Index Backfile | 1950
|Cofferdam Construction Monitoring of Haihe Bridge
British Library Conference Proceedings | 2014
|Cofferdam Construction Monitoring of Haihe Bridge
Trans Tech Publications | 2014
|