A platform for research: civil engineering, architecture and urbanism
Approaches to Delaware memorial bridge
Piers designed as twin shafts connected at top by spandrel; sheeted pits were excavated for pier foundations on Delaware side; tapered shaft heights ranged from 26.5 to 63 ft; ground for excavation on New Jersey side was dried by wellpoints while piles from 49 to 60 ft were driven; concreting procedure.
Approaches to Delaware memorial bridge
Piers designed as twin shafts connected at top by spandrel; sheeted pits were excavated for pier foundations on Delaware side; tapered shaft heights ranged from 26.5 to 63 ft; ground for excavation on New Jersey side was dried by wellpoints while piles from 49 to 60 ft were driven; concreting procedure.
Approaches to Delaware memorial bridge
Eng News-Rec
Engineering News-Record ; 144
1950
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1951
|Delaware memorial bridge over Delaware river
Engineering Index Backfile | 1948
Delaware memorial bridge substructure
Engineering Index Backfile | 1952
|Delaware memorial bridge: design problems
Engineering Index Backfile | 1952
|Construction of Delaware memorial bridge near Wilmington, Delaware
Engineering Index Backfile | 1953
|