A platform for research: civil engineering, architecture and urbanism
Reconstruction of double pier of new bridges over Escaut (Scheldt) river at Termonde
Reinforced concrete piers of 3 to 2 m width and 24.2 m length support double leaf bascule bridge; calculation of sheet piles; cofferdam and scaffolding.
Reconstruction of double pier of new bridges over Escaut (Scheldt) river at Termonde
Reinforced concrete piers of 3 to 2 m width and 24.2 m length support double leaf bascule bridge; calculation of sheet piles; cofferdam and scaffolding.
Reconstruction of double pier of new bridges over Escaut (Scheldt) river at Termonde
Reconstruction de la pile double des nouveaux ponts sur l'Escaut, a Termonde
Fougnies, A. (author)
1949
27 pages
3 Supp Plates, Photographs, Diagrams
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnels under Escaut River in Antwerp, Belgium
Engineering Index Backfile | 1947
|Memorial Bridge on Escaut at Eyne
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1966
|Pont en beton precontraint sur L-Escaut Oriental
Engineering Index Backfile | 1966
|Pier Scour on Slightly Skewed Double Bridges
British Library Conference Proceedings | 1998
|