A platform for research: civil engineering, architecture and urbanism
New tool saves time, cuts costs
Device, developed by B.SEARS and P.CRAIG, enables laying of masonry products without leveling, measuring or checking after original layout, thus providing means by which overall costs may be stabilized; it consists of foundation bracket to which is attached 14-ft story pole; pole, keyed to masonry courses, is held vertically by two adjustable guy struts; traveling carriage and arm assembly moves vertically on story pole by intervals corresponding to height of masonry course.
New tool saves time, cuts costs
Device, developed by B.SEARS and P.CRAIG, enables laying of masonry products without leveling, measuring or checking after original layout, thus providing means by which overall costs may be stabilized; it consists of foundation bracket to which is attached 14-ft story pole; pole, keyed to masonry courses, is held vertically by two adjustable guy struts; traveling carriage and arm assembly moves vertically on story pole by intervals corresponding to height of masonry course.
New tool saves time, cuts costs
Brick Clay Rec
Brick and Clay Record ; 117
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fast-track method saves time, cuts costs in construction
Taylor & Francis Verlag | 1973
|New technology saves time and reduces labour costs
British Library Online Contents | 2005
|British Library Online Contents | 2000
Soil engineering saves elevated tank costs
Engineering Index Backfile | 1963
|Trenchless technology saves costs in Atteridgeville
British Library Online Contents | 2002