A platform for research: civil engineering, architecture and urbanism
At Anchorage airport, clearing work was speeded by use of Trackson Treedozer; runways designed for 100,000-lb wheel load; runways consist of 13 to 16-in. subbase of pit run gravel, 18-in. base of 2-in. minus gravel, 3-in. asphaltic concrete mat topped by seal coat; base material placed by Jaeger spreader; list of equipment used.
At Anchorage airport, clearing work was speeded by use of Trackson Treedozer; runways designed for 100,000-lb wheel load; runways consist of 13 to 16-in. subbase of pit run gravel, 18-in. base of 2-in. minus gravel, 3-in. asphaltic concrete mat topped by seal coat; base material placed by Jaeger spreader; list of equipment used.
Alaska's largest airport project
Pac Bldr Engr
MacDonald, L. (author)
1949
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Alaska's largest construction job
Engineering Index Backfile | 1954
|Alaska's largest hydraulic fill dam
Engineering Index Backfile | 1942
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1956
Online Contents | 2011