A platform for research: civil engineering, architecture and urbanism
High concrete walls partition building into curing chambers for linoleum
Illustrated description of "stove" building consisting of series of huge, reinforced concrete walls, 16 in. thick, 59 ft high and 177 ft long; they form ovens used for curing of linoleum; during construction, temporary ties were used to support free-standing walls.
High concrete walls partition building into curing chambers for linoleum
Illustrated description of "stove" building consisting of series of huge, reinforced concrete walls, 16 in. thick, 59 ft high and 177 ft long; they form ovens used for curing of linoleum; during construction, temporary ties were used to support free-standing walls.
High concrete walls partition building into curing chambers for linoleum
Eng News-Rec
Engineering News-Record ; 136
1946
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2007
TIBKAT | 1993
|TIBKAT | 1991
|