A platform for research: civil engineering, architecture and urbanism
Building one-mile sewer by tunnelling
Illustrated description of 27 to 36-in. diam sewer built below normal water table in tunnel lined with timber in good soil and with metal plate in unstable ground; excavation was done with hand tools, and concrete required within tunnel was dropped down 6 in. diam pipes installed at 50 ft intervals.
Building one-mile sewer by tunnelling
Illustrated description of 27 to 36-in. diam sewer built below normal water table in tunnel lined with timber in good soil and with metal plate in unstable ground; excavation was done with hand tools, and concrete required within tunnel was dropped down 6 in. diam pipes installed at 50 ft intervals.
Building one-mile sewer by tunnelling
Eng News-Rec
Engineering News-Record ; 136
1946
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1909
|Engineering Index Backfile | 1929
|Salt lake's 250-mile sewer program
Engineering Index Backfile | 1956
|Seventeen-mile belt-line sewer at Springfield
Engineering Index Backfile | 1927
Three-mile outfall sewer laid below harbor bottom
Engineering Index Backfile | 1929