A platform for research: civil engineering, architecture and urbanism
General outline of project involving building of dam in Torcon creek, affluent of Tajo river, and 62 km aqueduct to reservoir at Toledo, with capacity of 4,000,000 cubic meters.
General outline of project involving building of dam in Torcon creek, affluent of Tajo river, and 62 km aqueduct to reservoir at Toledo, with capacity of 4,000,000 cubic meters.
Supply of potable water to Toledo
Abastecimiento De Agua Potable a Toledo
Ortiz Dou, A. (author)
1947
7 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Potable Water Treatment & Supply
Online Contents | 1998
Potable water: Its supply and distribution
Engineering Index Backfile | 1898
|The supply of towns with potable water
Engineering Index Backfile | 1903
|