A platform for research: civil engineering, architecture and urbanism
Demolition of Beacon hill tunnel, Kowloon-Canton railway
Tunnel is single track, standard gage which pierces Beacon Hill, about 4 mi north of Kowloon terminal; maximum cover above rail level is just over 1300 ft; it was destroyed Dec 8 1941 by Field Company Engineers of Hong Kong Volunteer Defence Corps; method of demolition described.
Demolition of Beacon hill tunnel, Kowloon-Canton railway
Tunnel is single track, standard gage which pierces Beacon Hill, about 4 mi north of Kowloon terminal; maximum cover above rail level is just over 1300 ft; it was destroyed Dec 8 1941 by Field Company Engineers of Hong Kong Volunteer Defence Corps; method of demolition described.
Demolition of Beacon hill tunnel, Kowloon-Canton railway
Ry Gaz
Walker, R.D. (author)
Railway Gazette ; 86
1947
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Beacon hill tunnel, Kowloon-Canton railway
Engineering Index Backfile | 1911
Reballasting the Kowloon Canton Railway Corporation (KCRC)
British Library Conference Proceedings | 1995
|Benchmarking within Kowloon - Canton Railway Corporation (KCRC)
British Library Conference Proceedings | 1995
|Kowloon Walled City demolition
British Library Online Contents | 1995
|Engineering Index Backfile | 1911
|