A platform for research: civil engineering, architecture and urbanism
Methods used in constructing television line in Oregan
Laying of 306 mi of underground coaxial cable from Cali fornia to Portland; mechanically operated plow, caterpillars, and cable layer used; methods employed in crossing rivers.
Methods used in constructing television line in Oregan
Laying of 306 mi of underground coaxial cable from Cali fornia to Portland; mechanically operated plow, caterpillars, and cable layer used; methods employed in crossing rivers.
Methods used in constructing television line in Oregan
Pac Bldr Engr
1947
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Methods used in constructing a 108-ft
Engineering Index Backfile | 1915
Methods and mixtures used in constructing tar concrete pavements
Engineering Index Backfile | 1915
|SYSTEM FOR CONSTRUCTING AND MANAGING VARIABLE LINE INFORMATION FOR CONSTRUCTING LINE INFORMATION
European Patent Office | 2018
|STRUT FOR CONSTRUCTING CONDUIT LINE AND METHOD FOR CONSTRUCTING CONDUIT LINE USING THE SAME
European Patent Office | 2015
|