A platform for research: civil engineering, architecture and urbanism
Report on demolition of partially bombed concrete structures in Belgium and France which had been constructed by Germans prior to Allied invasion; system used is adaptation of slice bar cutting process, using steel tube, filled with wiring, where oxygen is injected after having set extremity alight; 10 min is average time for drilling of 2 in. diam and 3 ft long holes in reinforced concrete. (See also - discussion n 10 Oct p 443-51)
Report on demolition of partially bombed concrete structures in Belgium and France which had been constructed by Germans prior to Allied invasion; system used is adaptation of slice bar cutting process, using steel tube, filled with wiring, where oxygen is injected after having set extremity alight; 10 min is average time for drilling of 2 in. diam and 3 ft long holes in reinforced concrete. (See also - discussion n 10 Oct p 443-51)
Thermic drilling of concrete and stone
Structural Engr
Lebrun, M. (author)
Structural Engineer ; 25
1947
20 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1975
|Thermic dehydroxylation of muscovite-2M1
British Library Online Contents | 1993
|Effect of sinusoidal thermic variations in concrete shells of linear elastic behavior
Engineering Index Backfile | 1968
|A bio-thermic seawater desalination system using halophytes
Online Contents | 2014
|Hygro-thermic behaviour of earth-bricks masonries
British Library Conference Proceedings | 1997
|