A platform for research: civil engineering, architecture and urbanism
Simplification of construction at intersections of concrete carriage-ways; advantage of scheme is that no angle is less than 90° and that construction can be carried forward with minimum delay and trouble. From Contract J, date not specified.
Simplification of construction at intersections of concrete carriage-ways; advantage of scheme is that no angle is less than 90° and that construction can be carried forward with minimum delay and trouble. From Contract J, date not specified.
Concrete roads
Indian Concrete J
Holloway, S.A. (author)
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
|Engineering Index Backfile | 1926
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1933
Engineering Index Backfile | 1928
|