A platform for research: civil engineering, architecture and urbanism
Suburban electrification on Central Argentine railway
Services in Buenos Aires area to be electrified from Retire to Tigre C, distance of 29 km; for supply of power, station of 12,000 kw capacity was built at Canal San Fernando; rolling stock is of multiple unit type.
Suburban electrification on Central Argentine railway
Services in Buenos Aires area to be electrified from Retire to Tigre C, distance of 29 km; for supply of power, station of 12,000 kw capacity was built at Canal San Fernando; rolling stock is of multiple unit type.
Suburban electrification on Central Argentine railway
Engineer
Engineer ; 183
1947
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of the Berlin suburban railway
Engineering Index Backfile | 1929
Electrification of Madras suburban section of South Indian Railway
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1929
|Great Northern suburban electrification into service
Tema Archive | 1977
|Engineering Index Backfile | 1924
|