A platform for research: civil engineering, architecture and urbanism
Prefabricated offshore drilling platform sets up in record time
Platform for Superior Oil Co's Gulf of Mexico State 1-A well consists of six prefabricated steel templates set side by side on floor of gulf; platform was in place, with piling all driven, in period of 9 working days; templates were towed from New Orleans to location on two barges, then lifted from barges and placed on bottom by 75-ton derricks; design and dimensional data.
Prefabricated offshore drilling platform sets up in record time
Platform for Superior Oil Co's Gulf of Mexico State 1-A well consists of six prefabricated steel templates set side by side on floor of gulf; platform was in place, with piling all driven, in period of 9 working days; templates were towed from New Orleans to location on two barges, then lifted from barges and placed on bottom by 75-ton derricks; design and dimensional data.
Prefabricated offshore drilling platform sets up in record time
Oil Gas J
Short, Jr., E.H. (author)
Oil and Gas Journal ; 46
1947
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hanging bracket for offshore prefabricated bearing platform construction
European Patent Office | 2023
|Offshore wind power prefabricated steel structure fan bearing platform
European Patent Office | 2021
|Prefabricated module structure for constructing offshore wind power platform
European Patent Office | 2024
|