A platform for research: civil engineering, architecture and urbanism
Construction of plant for utilizing head of middle Dordogne at Aigle, France
Technical details of plant described by A. VIBERT in article separately indexed from Dec 1 and 15 1943 issues; preliminary work; concrete construction; transportation of cement; concrete proportioning and mixing; properties of concrete; welding of penstocks. (See also - n 5 Mar 1 1944 p 37-40)
Construction of plant for utilizing head of middle Dordogne at Aigle, France
Technical details of plant described by A. VIBERT in article separately indexed from Dec 1 and 15 1943 issues; preliminary work; concrete construction; transportation of cement; concrete proportioning and mixing; properties of concrete; welding of penstocks. (See also - n 5 Mar 1 1944 p 37-40)
Construction of plant for utilizing head of middle Dordogne at Aigle, France
La construction des ouvrages d'amenagement de la chute de l'aigle
Genie Civil ; 121
1944
4 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Utilizing head of middle Dordogne at Aigle, France
Engineering Index Backfile | 1943
|Dam and power plant at Aigle, France
Engineering Index Backfile | 1946
|Greenhouse and park, Dordogne, France
British Library Online Contents | 1998
Velodrome in Aigle, Switzerland
British Library Online Contents | 2004
|Hydroelectric power plant on Dordogne River at Bort, France
Engineering Index Backfile | 1956