A platform for research: civil engineering, architecture and urbanism
700,000 C.Y. roadway excavation belted across busy arterial
Practical use of 66-ft, 40-in. wide endless belt conveyor supported on wheel mounted steel frames on roadway shoulders, to transport excavated material across street without interfering with traffic.
700,000 C.Y. roadway excavation belted across busy arterial
Practical use of 66-ft, 40-in. wide endless belt conveyor supported on wheel mounted steel frames on roadway shoulders, to transport excavated material across street without interfering with traffic.
700,000 C.Y. roadway excavation belted across busy arterial
Roads Streets
Roads and Streets ; 90
1947
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
5-mile road job requires 700,000 Cu. Yd. Excavation
Engineering Index Backfile | 1942
Green policies deliver £700,000 five-year payback
Emerald Group Publishing | 1998
British Library Online Contents | 2000
BR appeals over (GBP)700,000 Ness viaduct collapse payment
Online Contents | 1994