A platform for research: civil engineering, architecture and urbanism
Clear, precise specifications and contracts invite lower bids
Factors which affect construction costs; example of deficiencies of specifications underlying construction of electrical duct line; another example concerning precast piles reveals that much could have been saved if specification had been adequate; to impose risks on contractor is recognized unfair. (See also Constructor v 29 n 10 Oct 1947 p 58, 60, 62)
Clear, precise specifications and contracts invite lower bids
Factors which affect construction costs; example of deficiencies of specifications underlying construction of electrical duct line; another example concerning precast piles reveals that much could have been saved if specification had been adequate; to impose risks on contractor is recognized unfair. (See also Constructor v 29 n 10 Oct 1947 p 58, 60, 62)
Clear, precise specifications and contracts invite lower bids
Civ Eng (NY)
Hills, G.B. (author) / Lovan, C.F. (author)
1947
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Clear, precise specifications and contracts invite lower bids
Engineering Index Backfile | 1947
|Namibia to invite second round bids
Online Contents | 1994
CONTRACTS - Bids called for Croydon Tramway.
Online Contents | 1995
CONTRACTS - Bids come in high on Øresund's tunnel.
Online Contents | 1995
Online Contents | 1996
|