A platform for research: civil engineering, architecture and urbanism
With reference to British conditions, builder's main trouble is uncertainty due to shortage of materials and to low labor output which in their turn have led to imposition of controls administered by too many Departments, to too many forms and to too much detailed interference; jobs are taking too long to finish and costs are high.
With reference to British conditions, builder's main trouble is uncertainty due to shortage of materials and to low labor output which in their turn have led to imposition of controls administered by too many Departments, to too many forms and to too much detailed interference; jobs are taking too long to finish and costs are high.
Present-day problems of builder
Roy Instn Chartered Surveyors -- J
Smith, E.J. (author)
1947
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Some problems of penstock builder
Engineering Index Backfile | 1957
|Problems confronting jig and fixture builder
Engineering Index Backfile | 1940
|Springer Verlag | 2023
|TIBKAT | 1.1978 -
|