A platform for research: civil engineering, architecture and urbanism
Illustrated description of method employed in reconstruction of steel bridge across Teltow Canal in Berlin; 90% of total steel weight of 220 tons was saved; in addition to saving in material, method could be carried out with existing construction equipment and with unskilled workers.
Illustrated description of method employed in reconstruction of steel bridge across Teltow Canal in Berlin; 90% of total steel weight of 220 tons was saved; in addition to saving in material, method could be carried out with existing construction equipment and with unskilled workers.
New method of raising destroyed bridges
Neuartiges Heben zerstoerter Bruecken
Klotzsch, E. (author)
Technik ; 1
1947
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Destroyed and damaged bridges in France
Engineering Index Backfile | 1945
Reconstruction of masonry bridges destroyed during the war
Engineering Index Backfile | 1919
|Reconstruction of war destroyed road bridges in Hessen, Germany
Engineering Index Backfile | 1949
|Reconstruction of two destroyed arch bridges over Neretva river in Mostar: Musala and Luka bridges
British Library Conference Proceedings | 2001
|Reconstruction of destroyed railroad bridges in occupied territory during the war
Engineering Index Backfile | 1919
|