A platform for research: civil engineering, architecture and urbanism
Union completes major improvements
Main line bottleneck at East Pittsburgh, Pa, eliminated and other problems solved by track changes involving extensive new bridging with unusual features; new Brinton bridge is 204-ft single span, through truss structure of Warren type; new low grade viaduct, 1601 ft in length, is of deck girder, with 19 spans supported on concrete piers and abutments; other structures described. (See also - n 9 Mar 1 1947 p 442-4, 460)
Union completes major improvements
Main line bottleneck at East Pittsburgh, Pa, eliminated and other problems solved by track changes involving extensive new bridging with unusual features; new Brinton bridge is 204-ft single span, through truss structure of Warren type; new low grade viaduct, 1601 ft in length, is of deck girder, with 19 spans supported on concrete piers and abutments; other structures described. (See also - n 9 Mar 1 1947 p 442-4, 460)
Union completes major improvements
Ry Age
Railway Age ; 122
1947
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pennsylvania completes many improvements at Baltimore
Engineering Index Backfile | 1935
EGS completes major Asian surveys
Online Contents | 1996
QR completes major mainline upgrade
British Library Online Contents | 1997
SNCF launches major improvements in Paris
British Library Online Contents | 1999
Oeuvres cinématographiques complètes
Online Contents | 2008
|