A platform for research: civil engineering, architecture and urbanism
Illustrated data on prestressed reinforced concrete 180-ft bridge over Marne River at Luzancy, France; structure has three main girders of cellular cross section; they were prefabricated and prestressed on river bank in three sections and transferred to final position by special equipment. Abstracted from "Travaux" Jan 1946. (See also Concrete and Constr Eng v 42 n 1 Jan 1947 p 17-20)
Illustrated data on prestressed reinforced concrete 180-ft bridge over Marne River at Luzancy, France; structure has three main girders of cellular cross section; they were prefabricated and prestressed on river bank in three sections and transferred to final position by special equipment. Abstracted from "Travaux" Jan 1946. (See also Concrete and Constr Eng v 42 n 1 Jan 1947 p 17-20)
New road bridge at Luzancy, France
Engineer
Freyssinet, M. (author)
Engineer ; 183
1947
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of luzancy bridge over the marne
Engineering Index Backfile | 1926
|New road bridge at Luzancy, France
Engineering Index Backfile | 1947
|Reconstruction of road bridge at Saint-Pierre-du-Vauvray, France
Engineering Index Backfile | 1948
|British Library Online Contents | 1997
|