A platform for research: civil engineering, architecture and urbanism
Lyon, France, lost 22 of its 24 bridges during war; permanent rebuilding is under way; notable jobs included construction of 160-ft masonry arch on hung falsework, and raising of 206-ft steel arch with jacks; illustrations show conditions of bridges before and during reconstruction.
Lyon, France, lost 22 of its 24 bridges during war; permanent rebuilding is under way; notable jobs included construction of 160-ft masonry arch on hung falsework, and raising of 206-ft steel arch with jacks; illustrations show conditions of bridges before and during reconstruction.
Lyon rebuilds its many wrecked bridges
Eng News-Rec
Mookaray, A. (author)
Engineering News-Record ; 138
1947
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repairing two bomb wrecked bridges
Engineering Index Backfile | 1939
|France rebuilds its rail bridges
Engineering Index Backfile | 1946
Engineering Index Backfile | 1944
|Repaired lock gates and bridges make Europe's war-wrecked harbors work
Engineering Index Backfile | 1945
|Online Contents | 2011