A platform for research: civil engineering, architecture and urbanism
Cameron highlands hydro-electric scheme
Major civil engineering works in 105-Mw power development at Cameron Highlands in Federation of Malaya comprise 15 mi of tunnels, 130-ft high dam and 2 power stations, larger of which is built underground and houses 4 25-Mw Pelton-driven alternators; details of mechanical and electrical plant and 120-mi transmission line, summary of costs, construction program and data concerning tunnels are given.
Cameron highlands hydro-electric scheme
Major civil engineering works in 105-Mw power development at Cameron Highlands in Federation of Malaya comprise 15 mi of tunnels, 130-ft high dam and 2 power stations, larger of which is built underground and houses 4 25-Mw Pelton-driven alternators; details of mechanical and electrical plant and 120-mi transmission line, summary of costs, construction program and data concerning tunnels are given.
Cameron highlands hydro-electric scheme
Instn Civ Engrs -- Proc
Dickinson, J.C. (author) / Gerrard, R.T. (author)
1963
38 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cameron highlands hydro electric scheme - Performance of the Ringlet reservoir
British Library Conference Proceedings | 1997
|Cameron Highlands/Batang Padang Hydroelectric Scheme: dam surveillance and performance review
British Library Conference Proceedings | 2004
|C09-2 DESILTING OF RINGLET RESERVOIR, CAMERON HIGHLANDS, MALAYSIA
British Library Conference Proceedings | 2005
|