A platform for research: civil engineering, architecture and urbanism
12-drill jumbo speeds tunneling cycle
How miners punched big horseshow tunnel through mile and half of solid mountain in Colorado Rockies 60 mi west of Denver; four drills worked on top and bottom decks and additional four were side mounted on jumbo riding rails into 8148 ft long tunnel; top rib sections, weighing 211 lb/ft were set with hydraulic equipment. (14299)
12-drill jumbo speeds tunneling cycle
How miners punched big horseshow tunnel through mile and half of solid mountain in Colorado Rockies 60 mi west of Denver; four drills worked on top and bottom decks and additional four were side mounted on jumbo riding rails into 8148 ft long tunnel; top rib sections, weighing 211 lb/ft were set with hydraulic equipment. (14299)
12-drill jumbo speeds tunneling cycle
Constr Methods Equip
1969
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New rubber-wheeled Drill Jumbo
British Library Online Contents | 2006
Tunnel progress at Parker Dam aided by large drill jumbo
Engineering Index Backfile | 1936
Senja tunnels test rail jumbo version of new Finnish S-drill
Tema Archive | 1984
|Jumbo dredgers need jumbo hoses
Online Contents | 1997