A platform for research: civil engineering, architecture and urbanism
Baufortschritte an der Muenchner U-Bahn
Construction of Munich subway advances; at open section forming long rectangle, 5 Mp bridge crane was installed; its track could be accommodated on narrow strip adjacent to excavation; having bridge span of 26 m, crane covers excavation, while one 6 m boom extends over site storage yard; crane was used for handling and installing retention walls and formwork, and for placing concrete. (46146)
Baufortschritte an der Muenchner U-Bahn
Construction of Munich subway advances; at open section forming long rectangle, 5 Mp bridge crane was installed; its track could be accommodated on narrow strip adjacent to excavation; having bridge span of 26 m, crane covers excavation, while one 6 m boom extends over site storage yard; crane was used for handling and installing retention walls and formwork, and for placing concrete. (46146)
Baufortschritte an der Muenchner U-Bahn
Baufortschritte an der Muenchner U-Bahn
Foerdern Und Heben ; 18
1968
2 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Moderner Tunnelbau bei der Muenchner U-Bahn
TIBKAT | 1978
|Erfahrungen mit dem Gleichstromsteller-Fahrzeug bei der Muenchner U-Bahn
Automotive engineering | 1978
|British Library Online Contents | 1995
|Neuplanung Muenchner Hauptbahnhof
British Library Online Contents | 1997
|British Library Online Contents | 1996
|