A platform for research: civil engineering, architecture and urbanism
Bar spacer sets pace for slipform paver
Features and operation of contractor built machine that enables crewmen placing and tying reinforcing steel to maintain 5-mi week pace; spacer for concrete highway reinforcing bars is built around bull float with 52 pulleys automatically laying longitudinal bars, and toggle arms that reach up between them to set transverse reinforcing in position at 4-ft intervals. (10486)
Bar spacer sets pace for slipform paver
Features and operation of contractor built machine that enables crewmen placing and tying reinforcing steel to maintain 5-mi week pace; spacer for concrete highway reinforcing bars is built around bull float with 52 pulleys automatically laying longitudinal bars, and toggle arms that reach up between them to set transverse reinforcing in position at 4-ft intervals. (10486)
Bar spacer sets pace for slipform paver
Constr Methods Equip
Juergens, R.E. (author)
1968
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Slipform paver and method for operating a slipform paver
European Patent Office | 2023
|SLIPFORM PAVER AND METHOD FOR OPERATING A SLIPFORM PAVER
European Patent Office | 2019
|