A platform for research: civil engineering, architecture and urbanism
Slope extension speeds reservoir paving
Solution of problem of how to pave up slope to very rim of narrow-crested reservoir dike without danger of having paving machine topple forward past rim in construction of Seneca Reservoir at Kinzua Dam near Warren, Pa; paver was towed up along 2 to 1 slope of reservoir being blacktopped for pumped storage project; rig, with hopper sides built up to take 16 tons of mix, paved completely to rim, running onto 12 ft job-made sled at top of 170 ft slope. (47202)
Slope extension speeds reservoir paving
Solution of problem of how to pave up slope to very rim of narrow-crested reservoir dike without danger of having paving machine topple forward past rim in construction of Seneca Reservoir at Kinzua Dam near Warren, Pa; paver was towed up along 2 to 1 slope of reservoir being blacktopped for pumped storage project; rig, with hopper sides built up to take 16 tons of mix, paved completely to rim, running onto 12 ft job-made sled at top of 170 ft slope. (47202)
Slope extension speeds reservoir paving
Constr Methods Equip
1968
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Slope extension speeds reservoir paving
TIBKAT | 1969
|Online Contents | 1994
Iowa paving project "speeds" to completion
British Library Online Contents | 1993
Road slope protection net paving equipment and paving method thereof
European Patent Office | 2023
|