A platform for research: civil engineering, architecture and urbanism
Major scheme of improvement to docks includes lead-in jetty constructed to facilitate movement of ships entering lock to docks; pumping station was built to house 2 impounding pumps of 5-ft diam, and 2 h-p ram-pumps for hydraulic system at lock; methods of overcoming various difficulties encountered during progress of works are described.
Major scheme of improvement to docks includes lead-in jetty constructed to facilitate movement of ships entering lock to docks; pumping station was built to house 2 impounding pumps of 5-ft diam, and 2 h-p ram-pumps for hydraulic system at lock; methods of overcoming various difficulties encountered during progress of works are described.
Swansea docks-entrance works
Instn Civ Engrs -- Proc
Boyce, H.R. (author)
1963
24 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lead-in jetty and pumping station in Swansea Docks scheme
Engineering Index Backfile | 1963
|Swansea Wastewater Treatment Works
British Library Online Contents | 1998
Southampton docks extension works
Engineering Index Backfile | 1929
Southampton docks improvement works
Engineering Index Backfile | 1940
|Civil Engineering Category - Swansea Wastewater Treatment Works
Online Contents | 1998