A platform for research: civil engineering, architecture and urbanism
Processed talus serves as fill
On site talus deposits supply core and shell zone material for Round Butte Dam, 440-ft-high rock and earth-fill structure under construction on Deschutes River near Madras, Ore; processed talus furnished most of impervious core zone material; dam's rock shell is combination of processed talus and quarried rock; machinery used to dig into talus and processing plant are described. (See also Construction Methods and Equipment v 46 n 3 Mar 1964 p 95-6)
Processed talus serves as fill
On site talus deposits supply core and shell zone material for Round Butte Dam, 440-ft-high rock and earth-fill structure under construction on Deschutes River near Madras, Ore; processed talus furnished most of impervious core zone material; dam's rock shell is combination of processed talus and quarried rock; machinery used to dig into talus and processing plant are described. (See also Construction Methods and Equipment v 46 n 3 Mar 1964 p 95-6)
Processed talus serves as fill
Eng News-Rec
Engineering News-Record ; 172
1964
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Processed talus serves as fill
Engineering Index Backfile | 1964
British Library Online Contents | 2001
|Talus Royal(R) on A83 motorway
Online Contents | 2001
|Stability of Talus Slope at Lewistown Narrows
British Library Conference Proceedings | 2000
|Situation & Prospect of Research on Talus Slope
Tema Archive | 2013
|