A platform for research: civil engineering, architecture and urbanism
Erection of arch bridge over Kawarau river
New bridge which will replace old suspension bridge 15 mi from Queenstown is 392 ft long, including arch span of 280 ft length and 40 ft rise, and is built into precipitous sides of rock gorge, with deck-level 130 ft above river level; erection method and construction are described.
Erection of arch bridge over Kawarau river
New bridge which will replace old suspension bridge 15 mi from Queenstown is 392 ft long, including arch span of 280 ft length and 40 ft rise, and is built into precipitous sides of rock gorge, with deck-level 130 ft above river level; erection method and construction are described.
Erection of arch bridge over Kawarau river
New Zealand Eng
Garden, J.P. (author) / Haisman, B. (author)
1963
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Closure to Erection of Arch Bridge
ASCE | 2021
|Discussion on Erection of Arch Bridge
ASCE | 2021
|Erection of Columbia River Bridge erection
Engineering Index Backfile | 1894
Erection of the Bellows Falls Arch Bridge
ASCE | 2021
|Erection of the Bellows falls arch bridge
Engineering Index Backfile | 1908