A platform for research: civil engineering, architecture and urbanism
Ventilation and air conditioning installation of office building of Farbenfabriken Bayer Co, Leverkusen
31-story building is fully air conditioned, with room temperature, relative air humidity, and air pressure controlled centrally, and also individually on each floor; 18 measuring devices distributed on outer walls of building relay weather conditions (intensity of sun radiation, wind force, and temperature) to central control station; heating, cooling and ventilating systems are described in detail.
Ventilation and air conditioning installation of office building of Farbenfabriken Bayer Co, Leverkusen
31-story building is fully air conditioned, with room temperature, relative air humidity, and air pressure controlled centrally, and also individually on each floor; 18 measuring devices distributed on outer walls of building relay weather conditions (intensity of sun radiation, wind force, and temperature) to central control station; heating, cooling and ventilating systems are described in detail.
Ventilation and air conditioning installation of office building of Farbenfabriken Bayer Co, Leverkusen
Lueftungs- und Klimaanlagen im Hochhaus der Farbenfabriken Bayer AG, Leverkusen
Laakso, H. (author) / Wuerstlin, D. (author) / Halm, M. (author)
1964
11 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Bayer-Hochhaus : Farbenfabriken Bayer A.G., Leverkusen
UB Braunschweig | 1963
|Bayer-Hochhaus : Farbenfabriken Bayer A.G., Leverkusen
TIBKAT | 1963
|Steel skeleton of office building W1 of Farbenfabrik Bayer AG in Leverkusen
Engineering Index Backfile | 1964
|Doppelbodenkonstruktion der Konzernzentrale Bayer in Leverkusen
British Library Online Contents | 2003