A platform for research: civil engineering, architecture and urbanism
Selection of installed capacity at hydroelectric power plants
Concepts, methods, and procedures, useful with problems of hydroelectric power plant economics; procedure for determining maximum feasible installed capacity at any given plant, and most economic installation for each phase of system power supply; three phases of hydro operation; problems of installations at storage plants.
Selection of installed capacity at hydroelectric power plants
Concepts, methods, and procedures, useful with problems of hydroelectric power plant economics; procedure for determining maximum feasible installed capacity at any given plant, and most economic installation for each phase of system power supply; three phases of hydro operation; problems of installations at storage plants.
Selection of installed capacity at hydroelectric power plants
Am Soc Civ Engrs -- Proc Separate
Wing, L.S. (author) / Griffin, R.H. (author)
1955
36 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Capacity of hydroelectric power plants
Engineering Index Backfile | 1945
|Modern Hydroelectric Power Plants
Engineering Index Backfile | 1930
|Adequacy of the capacity of hydroelectric plants in large power systems
Online Contents | 1972
|