A platform for research: civil engineering, architecture and urbanism
First large weir gate in Switzerland of completely welded construction; upper and lower gate described, tests indicated and details on assembly of structure given.
First large weir gate in Switzerland of completely welded construction; upper and lower gate described, tests indicated and details on assembly of structure given.
Stoney gates of Birsfelden dam
Acier-Stahl-Steel
Gutknecht, A. (author)
Acier-Stahl-Steel ; 20
1955
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Winter operation of stoney gates
Engineering Index Backfile | 1914
The stoney gates of La Pena dam
Engineering Index Backfile | 1927
|Typologie - Wohnzeile in Birsfelden - Morger & Degelo
Online Contents | 2006
... in die Jahre gekommen Kraftwerk Birsfelden
British Library Online Contents | 2006
|INCREMENTAL LAUNCH: THE STONEY TRAIL BRIDGE
Online Contents | 1998
|