A platform for research: civil engineering, architecture and urbanism
Clay and stone placed to make good dike
Construction of impervious clay core dike for cofferdam walls of Chicago's new $85,000,000 Central Filtration plant; of primary requirement in dike construction is foundation design to resist compression and shear stresses of 700 psf; construction procedure.
Clay and stone placed to make good dike
Construction of impervious clay core dike for cofferdam walls of Chicago's new $85,000,000 Central Filtration plant; of primary requirement in dike construction is foundation design to resist compression and shear stresses of 700 psf; construction procedure.
Clay and stone placed to make good dike
Construction Methods Equipment
1955
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
"Placed-stone" jetty, stone weight coefficients
Engineering Index Backfile | 1964
|Soil Nailing in Clay for Dike Reinforcement
British Library Conference Proceedings | 2009
|Prediction of Bearing Capacity of Stone Columns Placed in Soft Clay Using ANN Model
Springer Verlag | 2018
|Prediction of Bearing Capacity of Stone Columns Placed in Soft Clay Using ANN Model
Online Contents | 2017
|Prediction of Bearing Capacity of Stone Columns Placed in Soft Clay Using ANN Model
Online Contents | 2017
|