A platform for research: civil engineering, architecture and urbanism
Precasting cuts pier costs on Richmond-San Rafael bridge
Bridge, 4 mi long over water, and 5.5 mi long with approaches; solid rock suitable for firm foundation lies at 30 to 300 ft below water; steel H-piles were driven into hard strata; each pile driven to 100 tons of bearing; precast cone diaphragm set on top of piles, which support concrete shaft.
Precasting cuts pier costs on Richmond-San Rafael bridge
Bridge, 4 mi long over water, and 5.5 mi long with approaches; solid rock suitable for firm foundation lies at 30 to 300 ft below water; steel H-piles were driven into hard strata; each pile driven to 100 tons of bearing; precast cone diaphragm set on top of piles, which support concrete shaft.
Precasting cuts pier costs on Richmond-San Rafael bridge
World Construction
1955
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precasting cuts shop building costs
Engineering Index Backfile | 1949
Engineering Index Backfile | 1958
Richmond-San Rafael Bridge Innovative Foundation Retrofit
British Library Conference Proceedings | 1998
|Precasting cuts cost of shells
Engineering Index Backfile | 1964
Richmond-San Rafael Bridge West Trestle Replacement
ASCE | 2000
|